|
North Hills Church of God Master Plan

This Master Planning effort was intended to establish a solid document upon which to plan for
future facility decisions.
During this process information was gathered by interviewing eight different ministry and
staff areas. The information was analyzed and organized to summarize both the current and long-range needs of
the church.
This information was then developed into a preliminary space program and cost analysis. The
space program, along with the goals, concepts, needs and facts derived from the interviews were then translated
into preliminary relational diagrams, and ultimately developed into preliminary phasing concepts.
Visualizing the proposed phases was also important so that the congregation could understand the
planning and share in the vison of the ministry and staff planning groups. Conceptual renderings of the proposed
phases were developed using computer-aided visualization techniques to aid in this process.
|